
UAE brings third power unit of Barakah NPP into operation
The Emirates Nuclear Energy Corporation (ENEC) has announced the bringing into commercial operation of the third power unit of the Barakah nuclear power plant (NPP) with a capacity of 1.4 gigawatts (GW). The aggregate capacity of the country’s first-ever NPP has now reached 4.2 GW.