• Contacts
  • Privacy policy
RU
The Global Energy Association
Advertisement
  • Association
    • About us
    • Co-founders
    • Partners
    • Collaboration (Partnership)
  • The Prize
    • About the Prize
    • International Award Committee
    • Regulations for the awards
    • How to nominate
  • Laureates
  • Press centre
    • News
      • Award
      • Events
      • Projects
      • Science and Technology
    • Video
    • Photo
    • Documentaries
    • Media Contact Information
    • Сorporate identity
  • Events
    • Global Energy Prize Laureate Announcement Ceremony
    • Award Ceremony
    • Honorary Diplomas of the Association
    • “Young Scientist 4.0”
    • Regional to Global
    • Annual report “10 Breakthrough Ideas in Energy for the Next 10 Years”
    • Global Energy Scientific Journal
    • Summit
  • Video
    • Documentaries
    • Interview
    • Events
    • Short videos
No Result
View All Result
  • Association
    • About us
    • Co-founders
    • Partners
    • Collaboration (Partnership)
  • The Prize
    • About the Prize
    • International Award Committee
    • Regulations for the awards
    • How to nominate
  • Laureates
  • Press centre
    • News
      • Award
      • Events
      • Projects
      • Science and Technology
    • Video
    • Photo
    • Documentaries
    • Media Contact Information
    • Сorporate identity
  • Events
    • Global Energy Prize Laureate Announcement Ceremony
    • Award Ceremony
    • Honorary Diplomas of the Association
    • “Young Scientist 4.0”
    • Regional to Global
    • Annual report “10 Breakthrough Ideas in Energy for the Next 10 Years”
    • Global Energy Scientific Journal
    • Summit
  • Video
    • Documentaries
    • Interview
    • Events
    • Short videos
No Result
View All Result
The Global Energy Association
No Result
View All Result
Home News

Japan continues to restart its nuclear reactors

Chugoku Electric Power will restart the second power unit of the Shimane nuclear power plant (NPP) on December 7, years after the plant was shut down in 2012. The power unit is equipped with a 789-megawatt (MW) boiling water reactor, which generates steam in the core and sends it to a turbine to produce electricity. Reactors of this type were used at the Fukushima Daiichi NPP, where an accident forced Japanese regulators to temporarily shut down all NPPs that were in operation at the time.

15.11.2024
in News
A A
Japan continues to restart its nuclear reactors
271
SHARES
2.1k
VIEWS

While prior to the Fukushima Daiichi accident, nuclear reactors accounted for 25% of Japan’s power output, their share dropped to zero by 2014, following the regulators’ decision to shut down all of the country’s nuclear power units. The process of restarting the reactors began in 2015. According to the IAEA, there are currently 12 nuclear power units with a total net capacity of 11 gigawatts (GW) regularly operating in the country. The remaining 48 reactors can be divided into two categories: 27 units with an aggregate capacity of 17.1 GW that were permanently decommissioned and 21 reactors with a total capacity of 20.6 GW that can resume operation subject to regulatory approval.

New safety requirements established in 2013 prohibit reactors and other nuclear infrastructure facilities from sitting above active faults within Earth’s crust, of which there are tens of thousands in Japan. Since these faults can cause devastating earthquakes, regulators take this factor into careful consideration when issuing permits to restart power plants. This is why the Nuclear Regulation Authority of Japan refused in November 2024 to restart the second power unit of the Tsuruga NPP on the island of Honshu by the Sea of ​​Japan.

Thanks to the gradual restart of nuclear reactors, the share of NPPs in Japan’s energy mix rose from 0.4% in 2015 to 7.6% in 2023. The share of gas-fired power generation over the same period fell from 40.5% to 34.3%, with liquefied natural gas (LNG) imports going down by more than 20% (from 115.9 billion cubic meters to 90.3 billion). Japan plans to increase the share of NPPs in its energy mix to 20% by 2030, including through the introduction of new reactors. These include the single-unit Ōma NPP on Honshu and the third power unit of the aforementioned Shimane NPP, which are currently under construction. Last year, a policy document of Japan’s Cabinet called for the construction of innovative reactors to replace power units that had been completely decommissioned.

Tags: GasJapanNatural gasNuclearNuclear ReactorsOperationPower generationPower plantsProcessReactorsSafety

Related Posts

Scientists propose producing synthetic jet fuel from CO₂ and water in single reactor
News

Scientists propose producing synthetic jet fuel from CO₂ and water in single reactor

10.09.2026
1.6k
Global plastic waste trade generating millions of tons of microplastics
News

Global plastic waste trade generating millions of tons of microplastics

09.09.2026
1.5k
Scientists discover the design of “living wires” in cable bacteria
News

Scientists discover the design of “living wires” in cable bacteria

09.09.2026
2.2k
Load More

News

Scientists propose producing synthetic jet fuel from CO₂ and water in single reactor

Global plastic waste trade generating millions of tons of microplastics

Scientists discover the design of “living wires” in cable bacteria

Storing hydrogen as liquid ammonia in salt caverns deemed 300 times more efficient than gas storages

Thorium fuel could almost double fast reactors’ operating cycle

Heat storage to supply household’s daily power demand

Load More
  • Contacts
  • Privacy policy

© 2026 Global Energy Association 8+

No Result
View All Result
  • Association
    • About us
    • Co-founders
    • Partners
    • Collaboration (Partnership)
  • The Prize
    • About the Prize
    • International Award Committee
    • Regulations for the awards
    • How to nominate
  • Laureates
  • Press centre
    • News
      • Award
      • Events
      • Projects
      • Science and Technology
    • Video
    • Photo
    • Documentaries
    • Media Contact Information
    • Сorporate identity
  • Events
    • Global Energy Prize Laureate Announcement Ceremony
    • Award Ceremony
    • Honorary Diplomas of the Association
    • “Young Scientist 4.0”
    • Regional to Global
    • Annual report “10 Breakthrough Ideas in Energy for the Next 10 Years”
    • Global Energy Scientific Journal
    • Summit
  • Video
    • Documentaries
    • Interview
    • Events
    • Short videos
Русская версия

© 2026 Global Energy Association 8+